JOB OBJECTIVE
Responsible for MTO Preparation on site as & when needed, Review of Engineering Documents and drawings, Material Procurement for site material in case needed, coordination with engineering team, Weekly/daily meeting attending, Engineering support and overall supervision for all Mechanical and piping activities.
KEY RESPONSIBILITIES
- Monitors and expedite field construction co-ordination efforts, co-ordination with sub-contractors, client representative and other internal stake holders as needed, documents and reports field construction activities
- Coordinate with Engineering, Construction, Procurement and Project groups to review the scope of work in terms of deliverables to be submitted to the client, to finalize schedules to be met, and utilize resources required as per contract
- Preparing the WBS for all Tanks activities and identifying the quantity of work required on micro level
- Familiar with interface project work sequence, activities and deliverables during project phase with knowledge and understanding of a contract
- Continuously monitor progress against planned progress and facilitate workaround plans to expedite progress
- Checking whether the CP is carried out and testing and final check done before the base plate installation
- Constantly reviewing the execution philosophy in terms of efficiency and safety, when warranted, provide plausible alternatives
- Tracking the work progress/ installation onsite with the help of trackers and updating the same on daily basis with respect to site DPRs
- Spot routine checks to ensure accurate IFC drawings are being followed by the site construction sub-contractor
- Undertake team briefings/ meetings to ensure all aspects of work are understood by all concerned parties
- Facilitate RFI’s and ensure compliance to ITR-A’s and or ITP’s or QCP’s
- Inspect the Work as completed to confirm that it was constructed in accordance with the Specifications and performed to the required standard of care
- Take reasonable steps to protect the health and safety of yourself and other people, and ensure with all applicable health and safety policies at all times
- Review of test packages prior to hydro test activity
- Fully familiarized with applicable design codes and regulations in oil and gas, water transmission industries like ASME, API
- Monitoring all the activity related to iso clearance, loop clearance, recording progress of Mechanical clearance
- At least 10 years’ experience in hands on, physical construction of pipelines, cold cutting and spillage prevention, tank welding and tank erection. (jacking and conventional)
- Sound, hand on knowledge and experience of rigging pertaining to tank erection/ fabrication
- Sound knowledge of scaffolding erection and modification related to tank erection
- Sound knowledge of grit and sand blasting, Primer, final painting
- Monitors the construction contractor’s production of red line records and communicates the same with engineering team
- Walk down with QA/QC Engineer for Material inspection once received in warehouse by material Team
- Upon completion of sub systems/ systems construction participates in punch list process to ensure the installation is in line with the issued IFC drawings and documents
- Schedules and facilitates meetings construction contractor to resolve punch list issues. Coordinates solutions to disputed punch list items
WORKING RELATIONS
Internal:
- Internal Disciplinary checking of various documents with Electrical, Instrumentation, Civil / Structural, Rotary and static, piping Departments
- Communication with Company Engineering for site Technical queries & resolution
- Communication with Client representative on site for their Technical Queries, if any & resolution
- Communication with SC team for material and equipment delivery on time to be the schedule
KEY QUALIFICATIONS
- Able to handle multi-national work force in multiple projects in multi countries
- Able to work long hour as per demands of project
- Proficiency in English is a must
- Bachelor Degree in Mechanical Engineering
- A minimum of 10 years construction execution experience in Oil & Gas industry
- Review of 3D Modelling works for piping and equipment /Tank work
- Developing of ITR-A’a / ITP’s or QCP’s relating to piping and tank erection and fabrication
- Proficient in Microsoft Office
Rotation
3 month on/ 15 days off
*Only applicants meeting the strict criteria outlined above will be contacted as part of the shortlisting process.